Mostrar el registro sencillo del ítem

Artículo

dc.creatorIglesias González, María Nieveses
dc.creatorCarranza Mora, Franciscoes
dc.creatorMazuelos Rojas, Alfonsoes
dc.creatorRomero, Rafaeles
dc.creatorLorenzo Tallafigo, Juanes
dc.creatorRomero García, Auroraes
dc.creatorRamírez del Amo, Pabloes
dc.date.accessioned2022-01-19T08:01:52Z
dc.date.available2022-01-19T08:01:52Z
dc.date.issued2021
dc.identifier.citationIglesias González, M.N., Carranza Mora, F., Mazuelos Rojas, A., Romero, R., Lorenzo Tallafigo, J., Romero García, A. y Ramírez del Amo, P. (2021). The BRISA process as a path for efficient copper recovery from waste PCBs. Hydrometallurgy, 205, 105750.
dc.identifier.issn0304-386X (impreso)es
dc.identifier.urihttps://hdl.handle.net/11441/128967
dc.description.abstractIn the present work, a two-stage biohydrometallurgical process for copper extraction from waste PCBs is developed. The main goal of this study is to check whether to separate the chemical leaching of copper with ferric iron from the regeneration of the leaching agent by bacterial oxidation of the ferrous iron is an efficient route for copper recovery from waste PCBs. To test this proposal, large waste PCBs pieces were retained in a stirred tank reactor (STR) in contact with a leaching liquor circulating at a high flow rate between this STR and a bioreactor. The kinetics of leaching of large PCB pieces, when ferric iron is added in excess over the stoichiometric requirements, is limited by the rate of mass transfer of the leaching agent. A heterogeneous kinetic model was proposed to fit the experimental data. It was also found that by increasing the ferric iron concentration the leaching rate was increased. Process separation has proven to be a promising configuration in which the productivity of the bioreactor has fulfilled the leaching agent demand and 90% of copper extraction was achieved in 48 h for large waste PCBs.es
dc.formatapplication/pdfes
dc.format.extent7 p.es
dc.language.isoenges
dc.publisherElsevieres
dc.relation.ispartofHydrometallurgy, 205, 105750.
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectBRISA processes
dc.subjectWaste PCBes
dc.subjectBiohydrometallurgyes
dc.subjectCopper recoveryes
dc.titleThe BRISA process as a path for efficient copper recovery from waste PCBses
dc.typeinfo:eu-repo/semantics/articlees
dcterms.identifierhttps://ror.org/03yxnpp24
dc.type.versioninfo:eu-repo/semantics/publishedVersiones
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses
dc.contributor.affiliationUniversidad de Sevilla. Departamento de Ingeniería Químicaes
dc.relation.publisherversionhttps://doi.org/10.1016/j.hydromet.2021.105750es
dc.identifier.doi10.1016/j.hydromet.2021.105750es
dc.journaltitleHydrometallurgyes
dc.publication.volumen205es
dc.publication.initialPage105750es

FicherosTamañoFormatoVerDescripción
The BRISA process.pdf1.289MbIcon   [PDF] Ver/Abrir  

Este registro aparece en las siguientes colecciones

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Excepto si se señala otra cosa, la licencia del ítem se describe como: Attribution-NonCommercial-NoDerivatives 4.0 Internacional