Presentation
Permutation flowshop problems with initial availability constraints: Characterisation and Analysis
Author/s | Pérez González, Paz
Framiñán Torres, José Manuel González Rodríguez, Pedro Luis Ruiz Usano, Rafael |
Department | Universidad de Sevilla. Departamento de Organización Industrial y Gestión de Empresas I |
Publication Date | 2010 |
Deposit Date | 2020-12-29 |
Published in |
|
Abstract | This paper characterises the initial availability constraint problems in a permutation flowshop layout
considering different objectives: makespan, total flowtime and idle time. The goal is to analyse the structure ... This paper characterises the initial availability constraint problems in a permutation flowshop layout considering different objectives: makespan, total flowtime and idle time. The goal is to analyse the structure of solutions and to discuss the managerial implications of these three problems. Also, we intend to compare the cases with availability constraint with their classical counterparts, i.e. these problems with machines available on the planning horizon. The analysis raises an important conclusion of practical application: Since for most real-life environments scheduling is performed on a periodical basis and this would naturally lead to the unavailability of machines at the starting of the scheduling period, this scheduling decision problem becomes easier than its ‗classical‘ (i.e. without machine unavailability) counterpart. |
Project ID. | DPI2007-61345
P08-TEP-3630 |
Citation | Pérez González, P., Framiñán Torres, J.M., González Rodríguez, P.L. y Ruiz Usano, R. (2010). Permutation flowshop problems with initial availability constraints: Characterisation and Analysis. En International Conference on Industrial Engineering and Industrial Management (1415-1424), San Sebastián (España): ADINGOR ( Asociación para el Desarrollo de la Ingeniería de Organización). |
Files | Size | Format | View | Description |
---|---|---|---|---|
1415-1424.pdf | 409.9Kb | [PDF] | View/ | |