Author profile: Pérez González, Paz
Institutional data
Name | Pérez González, Paz |
Department | Organización Industrial y Gestión de Empresas I |
Knowledge area | Organización de Empresas |
Professional category | Profesora Titular de Universidad |
Request | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Statistics
-
No. publications
55
-
No. visits
4721
-
No. downloads
7127
Publications |
---|
PhD Thesis
![]() The 2-stage Assembly Scheduling Problem
(2022-11-22)
Today, manufacturing systems face new global challenges that require flexibility and quick reactions. To remain competitive, ... |
Article
![]() Constructive and composite heuristics for the 2-stage assembly scheduling problem with periodic maintenance and makespan objective
(Elsevier, 2022-11-15)
This paper addresses the 2-stage assembly scheduling problem to minimise makespan with availability constraints, where the ... |
Final Degree Project
![]() Programación de Operaciones en Talleres Abiertos. Análisis de Objetivos Relacionados con la Sostenibilidad
(2022-01-01)
Tras revisar las contribuciones literarias existentes hasta el momento, referentes a la programación de operaciones del ... |
Presentation
![]() Assessing the potential of decentralised scheduling: An experimental study for the job shop case
(Elsevier, 2022-01-01)
In this paper we investigate how decentralised scheduling approaches can be used to improve manufacturing scheduling. In ... |
Presentation
![]() Permutation flowshop scheduling problem with total core idle time minimization
(Elsevier, 2022-01-01)
In this paper, we present a deterministic permutation flowshop scheduling problem with a new objective function, the total ... |
Article
![]() New hard benchmark for the 2-stage multi-machine assembly scheduling problem: Design and computational evaluation
(Elsevier, 2021-08-01)
The assembly scheduling problem is a common layout with many applications in real manufacturing scenarios. Despite the ... |
Final Degree Project
![]() Heurística en taller de flujo regular con permutación y objetivo de sostenibilidad
(2021-01-01)
En este trabajo fin de grado se ha realizado un estudio sobre la minimización del consumo energético total de todas las ... |
Final Degree Project
![]() Análisis del problema Distributed Flow shop con permutación y objetivo Total Core Idle Time
(2021-01-01)
El objetivo de este estudio es la búsqueda de un método capaz de dar la mejor solución al problema de Programación de la ... |
Article
![]() Relationship between common objective functions, idle time and waiting time in permutation flow shop scheduling
(Elsevier, 2020-09-01)
This paper focuses on two components of idle time and waiting time, namely core idle time, ∑CITi, and core waiting time, ... |
Article
![]() Permutation flowshop scheduling with periodic maintenance and makespan objective
(Elsevier, 2020-05-01)
In this paper, we address the permutation flowshop scheduling problem with cyclical unavailability periods where no operation ... |
Article
![]() New efficient constructive heuristics for the two-stage multi-machine assembly scheduling problem
(Elsevier, 2020-02-01)
In this paper, we address the two-stage multi-machine assembly scheduling problem, a layout consisting of several dedicated ... |
Final Degree Project
![]() Metaheurísticas aplicadas al problema de Flowshop de permutación con dos conjuntos de trabajo
(2020-01-01)
En este Trabajo de Fin de Grado, se aboradará el problema de taller de flujo regular para dos conjuntos de trabajo. En ... |
Final Degree Project
![]() Análisis de un problema de secuenciación en un taller de flujo con dos conjuntos de trabajos
(2020-01-01)
En este presente documento se aborda el análisis de un problema de secuenciación en un taller de flujo con dos máquinas y ... |
Final Degree Project
![]() NEH aplicada al problema de programación de la producción con dos agentes y objetivo makespan
(2020-01-01)
Los problemas de Programación de la Producción son muy importantes en el mundo actual. Se puede decir que están presentes ... |
Master's Final Project
![]() Programación de la producción para problemas de flowshop con dos conjuntos de trabajos
(2020-01-01)
La programación de la producción es un área de interés industrial debido a la gran productividad que se puede llegar a ... |
Final Degree Project
![]() Minimización de los tiempos ociosos de las máquinas en el taller de flujo de permutación
(2020-01-01)
En este Trabajo de Fin de Grado se aborda el problema de la programación de operaciones en un entorno de taller de flujo ... |
Article
![]() Constructive heuristics for the unrelated parallel machines scheduling problem with machine eligibility and setup times
(Elsevier, 2019-05-01)
This work considers a scheduling problem identified in a factory producing customised Heating, Ventilation and Air ... |
Article
![]() Deterministic Assembly Scheduling Problems: A Review and Classification of Concurrent-Type Scheduling Models and Solution Procedures
(Elsevier, 2019-03-01)
Many activities in industry and services require the scheduling of tasks that can be concurrently executed, the most clear ... |
Article
![]() Using real-time information to reschedule jobs in a flowshop with variable processing times
(Elsevier, 2019-03-01)
In a time where detailed, instantaneous and accurate information on shop-floor status is becoming available in many ... |
Final Degree Project
![]() Reingeniería de procesos en una entidad colaboradora con la Seguridad Social
(2019-01-01)
El proyecto se basa en la realización de diferentes técnicas de reingeniería de procesos sobre un proceso administrativo ... |
Article
![]() Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective
(Elsevier, 2019-01-01)
In this paper we address the classical hybrid flow shop scheduling problem with makespan objective. As this problem is ... |
Article
![]() Single machine scheduling with periodic machine availability
(Elsevier Ltd, 2018-09-01)
In this paper we address the problem of scheduling jobs on a single machine with cyclical machine availability periods. ... |
Article
![]() Single machine scheduling with periodic machine availability
(Elsevier, 2018-09-01)
In this paper we address the problem of scheduling jobs on a single machine with cyclical machine availability periods. ... |
Article
![]() The distributed permutation flow shop to minimise the total flowtime
(Elsevier Ltd, 2018-04-01)
In the last years, researchers are paying special attention to scheduling in distributed environments due to the increasing ... |
Final Degree Project
![]() Modelos de programación Lineal para flowshop de permutación con restricciones de disponibilidad
(2018-01-01)
Disponemos de un número de máquinas (recursos), las cuales trabajan en un entorno de tipo flowshop, que se destinan al ... |
Article
![]() The 2-stage assembly flowshop scheduling problem with total completion time: Efficient constructive heuristic and metaheuristic
(Elsevier, 2017-12-01)
In this paper, we address the 2-stage assembly scheduling problem where there are m machines in the first stage to manufacture ... |
Article
![]() New approximate algorithms for the customer order scheduling problem with total completion time objective
(Elsevier, 2017-02-01)
In this paper, we study a customer order scheduling problem where a number of orders, composed of several product types, ... |
Article
![]() Order Scheduling with Tardiness Objective: Improved Approximate Solutions
(Elsevier, 2017-01-01)
The problem addressed in this paper belongs to the topic of order scheduling, in which customer orders --composed of ... |
Final Degree Project
![]() Soluciones exactas para el problema de flowshop de permutación con restricciones de disponibilidad periódicas
(2017-01-01)
El objetivo final del proyecto es la determinación de un modelo capaz de resolver de forma óptima. El procedimiento para ... |
Article
![]() Single machine interfering jobs problem with flowtime objective
(Springer, 2015-01-01)
Interfering jobs problems (or multi agents scheduling problems) are an emergent topic in the scheduling literature.In these ... |
Article
![]() Assessing scheduling policies in a permutation flowshop with common due dates
(2015-01-01)
This paper focuses onto a situation arising in most real-life manufacturing environments when scheduling has to be performed ... |
Presentation
![]() Two-agent scheduling problem with flowtime objective: Analysis of problem and exact method
(TUM School of Management, 2014-01-01)
|
Article
![]() A common framework and taxonomy for multicriteria scheduling problems with Interfering and competing Jobs: Multi-agent scheduling problems
(2014-01-01)
Most classical scheduling research assumes that the objectives sought are common to all jobs to be scheduled. However, ... |
Presentation
![]() Employing fast heuristics for operating room planning
(Demeulemeester and W. Herroelen, 2012-01-01)
|
Presentation
![]() Algoritmos aproximados para la resolución de la planificación de intervenciones quirúrgicas
(ADINGOR ( Asociación para el Desarrollo de la Ingeniería de Organización), 2010-01-01)
La planificación de intervenciones quirúrgicas consiste en determinar el plan quirúrgico a ejecutar en un horizonte temporal ... |
Presentation
![]() Permutation flowshop problems with initial availability constraints: Characterisation and Analysis
(ADINGOR ( Asociación para el Desarrollo de la Ingeniería de Organización), 2010-01-01)
This paper characterises the initial availability constraint problems in a permutation flowshop layout considering different ... |
Presentation
![]() Ajustes en el Proceso de una Unidad Quirúrgica. Un estudio basado en Simulación
(ADINGOR ( Asociación para el Desarrollo de la Ingeniería de Organización), 2010-01-01)
Presentamos un modelo de simulación basada en Eventos Discretos para manejar la incertidumbre en la duración real de la ... |
Article
![]() Setting a common due date in a constrained flowshop: A variable neighbourhood search approach
(2010-01-01)
In this paper we study a due date setting problem in a flowshop layout. The problem consists of scheduling a set of jobs ... |
Article
![]() Modelado de Procesos para la Integración de Sistemas en el Sector Salud: Casos de Estudio
(Sociedad Informática de la Salud (SEIS), 2009-01-01)
|
Presentation |
Presentation
![]() Sistemas Available-To-Promise (ATP): Marco de aplicación
(ADINGOR (Asociación para el desarrollo de la ingeniería de organización), 2009-01-01)
|
Presentation
![]() Experiencias en la aplicación de un nuevo sistema de Evaluación Formativa en el ámbito del EEES
(ADINGOR (Asociación para el desarrollo de la ingeniería de organización), 2009-01-01)
El proceso de aprendizaje es un proceso importante y controvertido en la enseñanza, el cual puede ser observado desde ... |
Presentation
![]() Modelos para la resolución de la programación de quirófanos
(ADINGOR (Asociación para el desarrollo de la ingeniería de organización), 2009-01-01)
|
Article
![]() Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics
(2009-01-01)
In this paper, we address the problem of scheduling a set of jobs in a flowshop with makespan objective. In contrast to ... |
Presentation
![]() A survey of parallel hybrid applications to the permutation flow shop scheduling problem and similar problems
(ADINGOR, 2009-01-01)
Parallel algorithms have focused an increased interest due to advantages in computation time and quality of solutions when ... |
Presentation
![]() Comparación de dos medidas de la eficiencia de algoritmos paralelos
(ADINGOR ( Asociación para el Desarrollo de la Ingeniería de Organización), 2007-01-01)
Se comparan, en este trabajo, dos posibilidades para medir la e?ciencia de un algoritmo paralelo, o su capacidad de ... |
Presentation
![]() Problema de secuenciación para máquinas no disponibles: revisión de la literatura
(ADINGOR ( Asociación para el Desarrollo de la Ingeniería de Organización), 2007-01-01)
El problema de secuenciación de trabajos en talleres de fl ujo regular o fl owshop ha sido ampliamente estudiado en la ... |
Presentation
![]() Análisis de las soluciones del problema de secuenciación en un flujo regular de permutación con máquinas no disponibles con el objetivo de minimizar el makespan
(ADINGOR (Asociación para el desarrollo de la ingeniería de organización), 2007-01-01)
El problema de secuenciación de trabajos en talleres de flujo regular o Flowshop ha sido ampliamente estudiado en la ... |
Presentation
![]() Comparación de dos medidas de la eficiencia de algoritmos paralelos
(ADINGOR, 2007-01-01)
Se comparan, en este trabajo, dos posibilidades para medir la efi ciencia de un algoritmo paralelo, o su capacidad de ... |
Presentation
![]() Optimización de sistemas a medida mediante el algoritmo Cross-Entropy
(ADINGOR ( Asociación para el Desarrollo de la Ingeniería de Organización), 2006-01-01)
Uno de los mecanismos de control de la producción más recientes son los sistemas de control de la producción a medida ... |
Presentation
![]() Influencia de la granularidad en las prestaciones de algoritmos paralelos
(ADINGOR ( Asociación para el Desarrollo de la Ingeniería de Organización), 2006-01-01)
En el ámbito del procesamiento paralelo en computación, se conoce como granularidad la relación entre el tiempo de computación ... |
Presentation
![]() Interoperabilidad de sistemas guiado por modelos de procesos de negocios: una aplicación en el sector sanitario.
(ADINGOR, 2006-01-01)
En este trabajo se presenta la aplicación del modelado de procesos de negocio en un proyecto de interoperabilidad entre ... |
Article
![]() Metodología de Modelado de Procesos en Servicios de Salud utilizando Telemedicina
(Sociedad Informática de la Salud (SEIS), 2005-01-01)
Para cumplir el objetivo genérico del proyecto 1 “proporcionar un conjunto de herramientas (modelos, guías, módulos HW/ ... |
Article
![]() Modelado y Simulación de un Proceso de Atención Sanitaria: Aplicación al Proceso de Post-Transplante Hepático
(Sociedad Informática de la Salud (SEIS), 2005-01-01)
Las instituciones de gestión sanitaria deben proporcionar una medicina de alta calidad con costes controlados 1. Una parte ... |
Presentation
![]() Modelado de procesos y desarrollo de sistemas software: integración entre UML y EPC.
(2005-01-01)
Los objetivos de UML (Unified Modeling Language – Lenguaje Unificado de Modelado) y de la EPC (Event-driven Process Chain ... |