Mostrar el registro sencillo del ítem

Ponencia

dc.creatorPérez González, Pazes
dc.creatorFramiñán Torres, José Manueles
dc.creatorGonzález Rodríguez, Pedro Luises
dc.creatorRuiz Usano, Rafaeles
dc.date.accessioned2020-12-29T08:59:20Z
dc.date.available2020-12-29T08:59:20Z
dc.date.issued2010
dc.identifier.citationPérez González, P., Framiñán Torres, J.M., González Rodríguez, P.L. y Ruiz Usano, R. (2010). Permutation flowshop problems with initial availability constraints: Characterisation and Analysis. En International Conference on Industrial Engineering and Industrial Management (1415-1424), San Sebastián (España): ADINGOR ( Asociación para el Desarrollo de la Ingeniería de Organización).
dc.identifier.urihttps://hdl.handle.net/11441/103403
dc.description4th International Conference on Industrial Engineering and Industrial Management XIV Congreso de Ingeniería de Organización Donostia- San Sebastián , September 8th-10th 2010es
dc.description.abstractThis paper characterises the initial availability constraint problems in a permutation flowshop layout considering different objectives: makespan, total flowtime and idle time. The goal is to analyse the structure of solutions and to discuss the managerial implications of these three problems. Also, we intend to compare the cases with availability constraint with their classical counterparts, i.e. these problems with machines available on the planning horizon. The analysis raises an important conclusion of practical application: Since for most real-life environments scheduling is performed on a periodical basis and this would naturally lead to the unavailability of machines at the starting of the scheduling period, this scheduling decision problem becomes easier than its ‗classical‘ (i.e. without machine unavailability) counterpart.es
dc.description.sponsorshipMinisterio de Ciencia e Innovación DPI2007-61345es
dc.description.sponsorshipJunta de Andalucía P08-TEP-3630es
dc.formatapplication/pdfes
dc.format.extent10 p.es
dc.language.isoenges
dc.publisherADINGOR ( Asociación para el Desarrollo de la Ingeniería de Organización)es
dc.relation.ispartofInternational Conference on Industrial Engineering and Industrial Management (2010), p 1415-1424
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectSchedulinges
dc.subjectProblem characterisationes
dc.subjectPermutation flowshopes
dc.titlePermutation flowshop problems with initial availability constraints: Characterisation and Analysises
dc.typeinfo:eu-repo/semantics/conferenceObjectes
dcterms.identifierhttps://ror.org/03yxnpp24
dc.type.versioninfo:eu-repo/semantics/publishedVersiones
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses
dc.contributor.affiliationUniversidad de Sevilla. Departamento de Organización Industrial y Gestión de Empresas Ies
dc.relation.projectIDDPI2007-61345es
dc.relation.projectIDP08-TEP-3630es
dc.relation.publisherversionhttp://www.adingor.es/congresos/web/articulo/detalle/a/144es
dc.publication.initialPage1415es
dc.publication.endPage1424es
dc.eventtitleInternational Conference on Industrial Engineering and Industrial Managementes
dc.eventinstitutionSan Sebastián (España)es
dc.identifier.sisius5417921es

FicherosTamañoFormatoVerDescripción
1415-1424.pdf409.9KbIcon   [PDF] Ver/Abrir  

Este registro aparece en las siguientes colecciones

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Excepto si se señala otra cosa, la licencia del ítem se describe como: Attribution-NonCommercial-NoDerivatives 4.0 Internacional