dc.identifier.citationVera Galindo, C. (2018). Aplicación de la metodología BIM a un proyecto de construcción de un corredor de transporte para un complejo industrial. Modelo BIM 5D Costes. (Trabajo Fin de Máster Inédito). Universidad de Sevilla, Sevilla.
dc.identifier.urihttps://hdl.handle.net/11441/84165
dc.description.abstractEn el presente Trabajo Fin de Máster se realiza una investigación acerca de la aplicación de la metodología BIM a obras de la ingeniería civil, en particular, a infraestructuras lineales. Esta metodología de trabajo colaborativo está bastante consolidada en el sector de la edificación desde hace algún tiempo y, en la actualidad, se está comenzando a aplicar al campo de la ingeniería civil. Se realiza una revisión documental sobre el estado del arte del BIM en ingeniería civil, para aplicarlo, posteriormente, a la construcción de un corredor de trasporte. En cuanto a la revisión bibliográfica, se ha realizado una investigación en revistas divulgativas, revistas científicas, trabajos académicos, etc., de forma que se tenga una visión lo más global posible sobre las líneas en que se trabaja actualmente. La aplicación práctica consiste en aplicar la tecnología BIM para la construcción de una obra lineal mediante metodología BIM. Se modelizará un corredor de transporte que da acceso a una zona industrial, en un tramo donde transcurren de forma paralela una carretera y una vía ferroviaria. Se ha formalizado un Equipo de Obra compuesto por varios ingenieros civiles, asignándose a cada uno la ejecución de una disciplina. La disciplina BIM que se desarrolla en el proyecto de ejecución de este Trabajo Fin de Máster es la relativa al nivel BIM 5D de Costes. Esta disciplina desarrolla un presupuesto BIM para vincularlo a un modelo BIM 3D que permita llevar a cabo la valoración de la construcción de una infraestructura lineal y su seguimiento de obra. Para concluir el trabajo, se exponen las conclusiones y las posibles futuras líneas de investigación en relación a la aplicación de la metodología BIM a la ingeniería civil, y más concretamente a la ingeniería del transporte.es
dc.description.abstractThe main aim of this Dissertation is to study the usage of BIM methodology within civil engineering projects, including linear infrastructure. This collaborative methodology has been settled in the building sector for a while, however, it is now when being implemented in the civil engineering sector. Firstly, previous applications of BIM methodology in Civil Engineering will be reviewed, so that it can be applied to the construction of a transport corridor. For the literature review, magazines, scientific publications, previous studies, etc. have been reviewed to get a better overview of the current working lines. The construction of a linear work will be carried out using BIM. A model showing the access to an industrial zone, in which a road and railway line meets, will be created. A Work Team composed of several civil engineers has been formalized, assigning each one the execution of a discipline. The BIM discipline that is developed in the project for the execution of this Final Master's Project is the one related to the BIM 5D Costs level. This discipline develops a BIM budget to link it to a 3D BIM model that allows carrying out the assessment of the construction of a linear infrastructure and its monitoring of work. To conclude, some conclusions and further investigations lines related to the application of BIM in Civil Engineering – especially in Highways - are stated.es
dc.formatapplication/pdfes
dc.language.isospaes
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectBIMes
dc.subjectBIM civiles
dc.subjectModelos BIM para una obraes
dc.subjectBIM 5Des
dc.subjectCosteses
dc.subjectCivil BIMes
dc.subjectBIM modelses
dc.subjectCostses
dc.titleAplicación de la metodología BIM a un proyecto de construcción de un corredor de transporte para un complejo industrial. Modelo BIM 5D Costeses
dc.typeinfo:eu-repo/semantics/masterThesises
dc.type.versioninfo:eu-repo/semantics/publishedVersiones
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses
dc.contributor.affiliationUniversidad de Sevilla. Departamento de Construcciones Arquitectónicas Ies
dc.description.degreeUniversidad de Sevilla. Máster Universitario en Ingeniería de Caminos, Canales y Puertoses
idus.format.extent456 p.es

FicherosTamañoFormatoVerDescripción
TFM-1274-VERA.pdf35.45MbIcon   [PDF] Ver/Abrir  

Este registro aparece en las siguientes colecciones

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Excepto si se señala otra cosa, la licencia del ítem se describe como: Attribution-NonCommercial-NoDerivatives 4.0 Internacional