Mostrar el registro sencillo del ítem

Ponencia

dc.creatorValle Sevillano, Carmelo deles
dc.creatorToro Bonilla, Migueles
dc.creatorCeballos Guerrero, Rafaeles
dc.creatorAguilar, Jesúses
dc.date.accessioned2017-10-09T10:16:11Z
dc.date.available2017-10-09T10:16:11Z
dc.date.issued2002
dc.identifier.citationValle Sevillano, C.d., Toro Bonilla, M., Ceballos Guerrero, R. y Aguilar, J. (2002). A Pomset-Based Model for Estimating Workcells' Setups in Assembly Sequence Planning. En IBERAMIA 2002: 8th Ibero-American Conference on Artificial Intelligence (835-844), Sevilla, España: Springer.
dc.identifier.isbn978-3-540-00131-7es
dc.identifier.issn0302-9743es
dc.identifier.urihttp://hdl.handle.net/11441/65092
dc.description.abstractThis paper presents a model based on pomsets (partially ordered multisets) for estimating the minimum number of setups in the workcells in Assembly Sequence Planning. This problem is focused through the minimization of the makespan (total assembly time) in a multirobot system. The planning model considers, apart from the durations and resources needed for the assembly tasks, the delays due to the setups in the workcells. An A* algorithm is used to meet the optimal solution. It uses the And/Or graph for the product to assemble, that corresponds to a compressed representation of all feasible assembly plans. Two basic admissible heuristic functions can be defined from relaxed models of the problem, considering the precedence constraints and the use of resources separately. The pomset-based model presented in this paper takes into account the precedence constraints in order to obtain a better estimation for the second heuristic function, so that the performance of the algorithm could be improved.es
dc.formatapplication/pdfes
dc.language.isoenges
dc.publisherSpringeres
dc.relation.ispartofIBERAMIA 2002: 8th Ibero-American Conference on Artificial Intelligence (2002), p 835-844
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.titleA Pomset-Based Model for Estimating Workcells' Setups in Assembly Sequence Planninges
dc.typeinfo:eu-repo/semantics/conferenceObjectes
dc.type.versioninfo:eu-repo/semantics/submittedVersiones
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses
dc.contributor.affiliationUniversidad de Sevilla. Departamento de Lenguajes y Sistemas Informáticoses
dc.relation.publisherversionhttps://link.springer.com/chapter/10.1007/3-540-36131-6_85es
dc.identifier.doi10.1007/3-540-36131-6_85es
idus.format.extent10es
dc.publication.initialPage835es
dc.publication.endPage844es
dc.eventtitleIBERAMIA 2002: 8th Ibero-American Conference on Artificial Intelligencees
dc.eventinstitutionSevilla, Españaes
dc.relation.publicationplaceBerlines
dc.identifier.sisius6522362es

FicherosTamañoFormatoVerDescripción
302-arsessidel.pdf93.23KbIcon   [PDF] Ver/Abrir  

Este registro aparece en las siguientes colecciones

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Excepto si se señala otra cosa, la licencia del ítem se describe como: Attribution-NonCommercial-NoDerivatives 4.0 Internacional