Mostrar el registro sencillo del ítem

Trabajo Fin de Grado

dc.contributor.advisorFernández Baco, Custodia
dc.creatorPérez Urbano, Francisco Javieres
dc.date.accessioned2016-11-18T16:50:25Z
dc.date.available2016-11-18T16:50:25Z
dc.date.issued2016
dc.identifier.citationPérez Urbano, F.J. (2016). Escalado de una torre de absorción. (Trabajo Fin de Grado Inédito). Universidad de Sevilla, Sevilla.
dc.identifier.urihttp://hdl.handle.net/11441/48894
dc.description.abstractEl pasar de las experiencias de laboratorio a trabajar a nivel industrial es un procedimiento que implica muchos riesgos económicos y de seguridad si no se tienen unas bases o nociones sobre cómo hacerlo de manera correcta, y sobretodo, que se esté encaminado a la obtención de los mismos rendimientos deseados que en el laboratorio. De esta manera y basándose en esta idea se ha desarrollado este proyecto en el que primeramente se expondrá una idea general y que se puedan contestar preguntas como ¿Qué es el escalado?, ¿En qué se basa dicho procedimiento? y ¿De cuantas maneras se puede hacer? Entre otras preguntas. Por lo que en base a diferentes teorías sobre el escalado se responderán a estas preguntas, para después entrar de manera más detallada en los que serían los fundamentos físicos y matemáticos en los que se basa esta teoría. Toda esta teoría y desarrollo tendrá como fin el escalado (aumentar la escala de trabajo) de una planta de laboratorio diseñada previamente, la cual habrá que comprender primero para saber posteriormente cómo se comportará con más o menos detalle al trabajar a mayor escala, ya que ese es uno de los fines principales de cualquier escalado: trasladar los resultados que se han obtenido en un nivel más sencillo y económico de trabajar a otro en el que los riesgos son mayores y se debe trabajar sobre una base más segura. Finalmente, una vez expuestos todas los desarrollos teóricos y prácticos realizados sobre el tema que se utilizarán para pasar de una escala de trabajo a otra y aplicados al proceso específico con el que se trabaja (torre de relleno de un sistema de abatimiento de tars), se procederá al uso de las ecuaciones necesarias (realizando las suposiciones o simplificaciones pertinentes), y que darán como resultado el diseño preliminar de una nueva planta o equipo que será la base para el comienzo del trabajo en una escala en la cual es la que interesa obtener los mayores rendimientos (escala industrial), que se traducirán finalmente en una mayor rentabilidad económica.es
dc.description.abstractThe move from a laboratory experiences to work on an industrial scale is a process involving many economic and security risks if they do not have a foundation or notions about how to do it correctly, and above all, being aimed at obtaining same yields as desired in the laboratory. In this way and based on this idea the project has been developed that firstly will be discussed a general idea and then can be answered questions like, what is scaling up?, What this procedure is based? And how many ways can you do it? Among other questions. So based on different theories about scaling up these questions will be answered, after that the physical and mathematical foundations on which this theory is based will showed with more details. All this theory and development will aim the scaling up (to increase scale work) of a laboratory plant previously designed, which must be understood first to know later how it will behave with more or less detail when will working on a larger scale, because this is one of the main purposes of any scaling: move the results that have been obtained in a simple and economical level to work to another in which the risks are higher and a more secure footing is demanded. Finally, once exposed all the theoretical and practical developments made on about the subject that will be used to move from one scale work to another and applied to the specific process that (packed tower of a tars system reduction) is being worked, will proceed to use the necessary equations (making assumptions or relevant simplifications), and that will result in the preliminary design of a new plant or equipment, which will be the basis for the start of work on a scale which is of interest to obtain the highest yields (industrial scale) and which the latest objective is a greater profitability.es
dc.formatapplication/pdfes
dc.language.isospaes
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.subjectIngeniería Químicaes
dc.titleEscalado de una torre de absorciónes
dc.typeinfo:eu-repo/semantics/bachelorThesises
dc.type.versioninfo:eu-repo/semantics/publishedVersiones
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses
dc.contributor.affiliationUniversidad de Sevilla. Departamento de Ingeniería Química y Ambientales
dc.description.degreeUniversidad de Sevilla. Grado en Ingeniería Químicaes
idus.format.extent88 p.es
dc.identifier.idushttps://idus.us.es/xmlui/handle/11441/48894

FicherosTamañoFormatoVerDescripción
772.pdf2.074MbIcon   [PDF] Ver/Abrir  

Este registro aparece en las siguientes colecciones

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Excepto si se señala otra cosa, la licencia del ítem se describe como: Attribution-NonCommercial-NoDerivatives 4.0 Internacional