dc.creator | Fernández-Viagas Escudero, Víctor | es |
dc.creator | Prata, Bruno A. | es |
dc.creator | Framiñán Torres, José Manuel | es |
dc.date.accessioned | 2022-08-17T11:53:57Z | |
dc.date.available | 2022-08-17T11:53:57Z | |
dc.date.issued | 2022-07 | |
dc.identifier.citation | Fernández-Viaga, V., Prata, B.A. y Framiñán, J.M. (2022). A critical-path based iterated local search for the green permutation flowshop problem. Computers & Industrial Engineering, 169, 108276. | |
dc.identifier.issn | 0360-8352 | es |
dc.identifier.uri | https://hdl.handle.net/11441/136327 | |
dc.description.abstract | The permutation flowshop scheduling problem is a widely studied combinatorial optimization problem with
several real-world applications. In this paper we address a green variant of the problem with controllable processing times and two objective functions: one related to the service level of the factory (makespan) and another
one related to the total cost or the total energy/carbon consumption. For this problem we propose a novel
Critical-Path based Iterated Local Search. This metaheuristic incorporates several theoretical results to accelerate
the search of solutions in the intensification phase. The proposed algorithm has been compared on an extensive
benchmark with the most promising algorithms in the literature. The computational results show the excellent
performance of the proposal. | es |
dc.description.sponsorship | Ministerio de Ciencia e Innovación PID2019-108756RB-I00 | es |
dc.description.sponsorship | Junta de Andalucía US-1264511 | es |
dc.format | application/pdf | es |
dc.format.extent | 15 p. | es |
dc.language.iso | eng | es |
dc.publisher | Elsevier | es |
dc.relation.ispartof | Computers & Industrial Engineering, 169, 108276. | |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 Internacional | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.subject | Green scheduling | es |
dc.subject | Bi-objective | es |
dc.subject | Sustainable manufacturing | es |
dc.subject | Flow shop | es |
dc.subject | Carbon emissions reduction | es |
dc.title | A critical-path based iterated local search for the green permutation flowshop problem | es |
dc.type | info:eu-repo/semantics/article | es |
dcterms.identifier | https://ror.org/03yxnpp24 | |
dc.type.version | info:eu-repo/semantics/publishedVersion | es |
dc.rights.accessRights | info:eu-repo/semantics/openAccess | es |
dc.contributor.affiliation | Universidad de Sevilla. Departamento de Organización Industrial y Gestión de Empresas I | es |
dc.relation.projectID | PID2019-108756RB-I00 | es |
dc.relation.projectID | US-1264511 | es |
dc.relation.publisherversion | https://www.sciencedirect.com/science/article/pii/S0360835222003436 | es |
dc.identifier.doi | 10.1016/j.cie.2022.108276 | es |
dc.contributor.group | Universidad de Sevilla. TEP134: Organización Industrial | es |
dc.journaltitle | Computers & Industrial Engineering | es |
dc.publication.volumen | 169 | es |
dc.publication.initialPage | 108276 | es |