dc.contributor.advisor | Hernández Rodríguez, Francisco | es |
dc.creator | Martínez Roldán, José Abel | es |
dc.date.accessioned | 2022-08-11T08:43:49Z | |
dc.date.available | 2022-08-11T08:43:49Z | |
dc.date.issued | 2022 | |
dc.identifier.citation | Martínez Roldán, J.A. (2022). Estudios previos y anteproyecto de una fábrica de pinturas. (Trabajo Fin de Grado Inédito). Universidad de Sevilla, Sevilla. | |
dc.identifier.uri | https://hdl.handle.net/11441/136130 | |
dc.description.abstract | En este anteproyecto se ha realizado un estudio de viabilidad para acometer un proyecto de una fábrica de
pinturas. Para ello, en primer lugar, se hace un estudio de viabilidad técnica, donde se estudia el mercado, tanto
nacional como internacional. Además, se ha definido el proceso de producción completo, junto con las materias
primas y la instrumentación necesaria para realizarlo. Tras ello, se realiza una búsqueda del emplazamiento con
el objetivo de que sea lo más económico posible, siendo este, un lugar idóneo en cuanto a comunicación de
transporte por carretera. Se ha diseñado la distribución y el tamaño de la planta en función a las necesidades. A
continuación, se ha recopilado las normativas más importantes y necesarias a cumplir y sus vigencias. Y, por
último, se concluye con un estudio de viabilidad económica donde se calcularán varios parámetros indicadores
de la rentabilidad del proyecto para varios escenarios de financiación, que se compararán entre sí para obtener
la opción más rentable. | es |
dc.description.abstract | In this preliminary project, a feasibility study has been carried out to undertake a paint factory project. To do so,
firstly, a technical feasibility study has been carried out where the market, both national and international, has
been studied. In addition, the complete production process has been defined, together with the raw materials and
the necessary instrumentation to carry it out. After this, a site search was carried out with the aim of making it
as economical as possible, this being an ideal location in terms of road transport communications. The layout
and size of the plant was designed according to the needs. Next, the most important and necessary regulations
to be complied with and their validity have been compiled. And finally, it concludes with an economic feasibility
study where several parameters indicating the profitability of the project will be calculated for various financing
scenarios, which will be compared with each other to obtain the most profitable option. | es |
dc.format | application/pdf | es |
dc.format.extent | 117 p. | es |
dc.language.iso | spa | es |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 Internacional | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | * |
dc.title | Estudios previos y anteproyecto de una fábrica de pinturas | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
dc.type.version | info:eu-repo/semantics/publishedVersion | es |
dc.rights.accessRights | info:eu-repo/semantics/openAccess | es |
dc.contributor.affiliation | Universidad de Sevilla. Departamento de Ingeniería de la Construcción y Proyectos de Ingeniería | es |
dc.description.degree | Universidad de Sevilla. Grado Universitario en Ingeniería Química | es |