Mostrar el registro sencillo del ítem

Artículo

dc.creatorTalens Fayos, Carlaes
dc.creatorFernández-Viagas Escudero, Víctores
dc.creatorPérez González, Pazes
dc.creatorCosta, Antonioes
dc.date.accessioned2022-07-06T16:35:04Z
dc.date.available2022-07-06T16:35:04Z
dc.date.issued2022-11-15
dc.identifier.citationTalens Fayos, C., Fernández-Viagas, V., Pérez-González, P. y Costa, A. (2022). Constructive and composite heuristics for the 2-stage assembly scheduling problem with periodic maintenance and makespan objective. Expert Systems With Applications, 206, 117824.
dc.identifier.issn0957-4174es
dc.identifier.urihttps://hdl.handle.net/11441/135077
dc.description.abstractThis paper addresses the 2-stage assembly scheduling problem to minimise makespan with availability constraints, where the machines are not always available due to periodic maintenance activities. To the best of our knowledge, the periodic maintenance constraint has never been considered for the problem under investigation. In the proposed model, the preemption of operations is not allowed, and therefore, if an operation cannot be finished within the current availability period, then it has to be completely processed in the next one. Firstly, two constructive heuristics powered by a partial local search mechanism are proposed. Secondly, two composite heuristics are proposed incorporating an interchange-based local search mechanism. After that, two computational evaluations are carried out. On the one hand, 84 dispatching rules adapted from the literature, involving two bin-packing policies, are compared among them. On the other hand, the proposed methods are compared with existing heuristics from the literature. The computational results show that the adapted dispatching rules perform well for the two bin-packing policies, and the new proposals outperform the existing heuristics.es
dc.description.sponsorshipJunta de Andalucia (I+D+i FEDER Andalucia 2014–2020) “DEMAND” P18-FR-1149es
dc.description.sponsorshipJunta de Andalucia (I+D+i FEDER Andalucia 2014–2020) “EFECTOS" US-1264511es
dc.description.sponsorshipMinisterio de Ciencia e Innovación “ASSORT” PID2019-108756RB-I00.es
dc.formatapplication/pdfes
dc.format.extent16 p.es
dc.language.isoenges
dc.publisherElsevieres
dc.relation.ispartofExpert Systems With Applications, 206, 117824.
dc.subjectSchedulinges
dc.subjectAssemblyes
dc.subjectMakespanes
dc.subjectPreventive maintenancees
dc.subjectHeuristicses
dc.titleConstructive and composite heuristics for the 2-stage assembly scheduling problem with periodic maintenance and makespan objectivees
dc.typeinfo:eu-repo/semantics/articlees
dcterms.identifierhttps://ror.org/03yxnpp24
dc.type.versioninfo:eu-repo/semantics/acceptedVersiones
dc.rights.accessRightsinfo:eu-repo/semantics/embargoedAccesses
dc.contributor.affiliationUniversidad de Sevilla. Departamento de Organización Industrial y Gestión de Empresas Ies
dc.relation.projectIDUS-1264511es
dc.relation.projectIDP18-FR-1149es
dc.relation.projectIDPID2019-108756RB-I00es
dc.date.embargoEndDate2024-11-16
dc.relation.publisherversionhttps://www.sciencedirect.com/science/article/pii/S0957417422010855es
dc.identifier.doi10.1016/j.eswa.2022.117824es
dc.contributor.groupUniversidad de Sevilla. TEP134: Organización Industriales
dc.journaltitleExpert Systems With Applicationses
dc.publication.volumen206es
dc.publication.initialPage117824es

FicherosTamañoFormatoVerDescripción
Proofs_ESWA117824.pdf747.8KbIcon   [PDF] Este documento no está disponible a texto completo   hasta el  2024-11-16 . Para más información póngase en contacto con idus@us.es.

Este registro aparece en las siguientes colecciones

Mostrar el registro sencillo del ítem

Este documento está protegido por los derechos de propiedad intelectual e industrial. Sin perjuicio de las exenciones legales existentes, queda prohibida su reproducción, distribución, comunicación pública o transformación sin la autorización del titular de los derechos, a menos que se indique lo contrario.