Mostrar el registro sencillo del ítem

Trabajo Fin de Grado

dc.contributor.advisorRuiz Viola, María Cameliaes
dc.contributor.advisorAbella Monserrat, Ramónes
dc.creatorRodríguez Rodríguez, Pabloes
dc.date.accessioned2021-02-19T18:57:31Z
dc.date.available2021-02-19T18:57:31Z
dc.date.issued2020
dc.identifier.citationRodríguez Rodríguez, P. (2020). Estudio de alternativas para la implantación de una central hidroeléctrica. (Trabajo Fin de Grado Inédito). Universidad de Sevilla, Sevilla.
dc.identifier.urihttps://hdl.handle.net/11441/105170
dc.description.abstractEn el presente proyecto se realiza el estudio de alternativas, y el prediseño y análisis de viabilidad económica de una minicentral hidroeléctrica de nueva implantación en el Guadalquivir, en las proximidades de Mengíbar (Jaén) desde el punto de vista de la Ingenierñia Civil. En primer lugar, se presenta una breve introducción sobre las centrales hidroeléctricas. En segundo lugar, se realizan los estudios previos necesarios en todo proyecto de nueva contrucción desde distintos puntos de vista como el jurídico-administrativo, medioambiental, geológico e hidrológico. Posteriormente se lleva a cabo el estudio de inundación previo a la ejecución de la obra, el diseño de las infraestructuras y la realización del modelo de inundación posterior a la obra. Con todo, hasta ahora se logra conocer la afección desde el punto de vista de inundaciones tanto aguas arriba como aguas abajo y el salto de agua para el caudal de proyecto. Una vez se tiene la altura de la superficie libre aguas arriba y aguas abajo, y el perfil del azud se procede a la comprobación de la estabilidad de la estructura, es decir, se efectúan las comprobaciones al vuelco, deslizamiento y sifonamiento. Por último, se realiza el análisis de viabilidad económica tanto estático como dinámico, para lo cual previamente se determina en el Anexo correspondiente tanto las mediciones como el presupuesto.es
dc.description.abstractThe purpose of this project is to make out the analysis of aleternatives, a predisign of an hydropower plant and to develop the economic viability analysis from a civil engineering point of view. The hydropower station is located in the Guadalquivir river, next to Mengíbar (Jaén). Firstly, has been done a brief introduction about hydropower plants. Secondly, have been developed the essential studies in every project such as legal, environmental, or hydrologic. In order to know the influence of the project in the proximities of it, a previous and final floods study is carried out, however, previously to the final floods study, the design of all the infrastructures involved in the project is done. Once is known the water surface elevation upstream and downstream of the weir, the stability of it including overturning, sliding and piping is calculated. Finally, has been made out the viability analysis for which previously has been done the budget of the project.es
dc.formatapplication/pdfes
dc.format.extent132es
dc.language.isospaes
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/*
dc.titleEstudio de alternativas para la implantación de una central hidroeléctricaes
dc.typeinfo:eu-repo/semantics/bachelorThesises
dc.type.versioninfo:eu-repo/semantics/publishedVersiones
dc.rights.accessRightsinfo:eu-repo/semantics/openAccesses
dc.contributor.affiliationUniversidad de Sevilla. Departamento de Ingeniería Aeroespacial y Mecánica de Fluidoses
dc.description.degreeUniversidad de Sevilla. Grado en Ingeniería Civiles
dc.publication.endPage103 p.es

FicherosTamañoFormatoVerDescripción
TFG-3172-RODRIGUEZ RODRIGUEZ.pdf11.22MbIcon   [PDF] Ver/Abrir  

Este registro aparece en las siguientes colecciones

Mostrar el registro sencillo del ítem

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
Excepto si se señala otra cosa, la licencia del ítem se describe como: Attribution-NonCommercial-NoDerivatives 4.0 Internacional