NEH-based heuristics for the permutation flowshop scheduling problem to minimize total tardiness
(Elsevier, 2015)
Since Johnson׳s seminal paper in 1954, scheduling jobs in a permutation flowshop has been receiving the attention of hundreds of practitioners and researchers, being one of the most studied topics in the Operations Research ...
Artículo
Capacity restrictions and supply chain performance: Modelling and analysing load-dependent lead times
(Elsevier, 2018)
Several studies have reported that capacitated supply chains may benefit from an improved dynamic performance as compared to unconstrained ones. This occurs as a consequence of the capacity limit acting as a production ...
Tesis Doctoral
Modelos matemáticos para la obtención de políticas óptimas de mantenimiento. Caracterización y aplicación práctica
(2002-03-21)
El objetivo de este trabajo es establecer un camino para conseguir, de una manera científica, información con la que ayudar al responsable de mantenimiento a tomar decisiones acerca de la política de mantenimiento. Como ...
Tesis Doctoral
Artículo
Análisis multinivel de cadenas de suministros: dos técnicas de resolución del efecto bullwhip
(Departamento de Economía Métodos Cuantitativos e Historia Económica de la Universidad Pablo de Olavide, 2009)
El efecto bullwhip es un fen ́omeno causante de ineficienciasen la gesti ́onde la cadena de suministros. El objetivo del presente art ́ıculo es analizarel impacto sobre el rendimiento de una cadena de suministro de dos de ...
Artículo
Artículo
A new vision of approximate methods for the permutation flowshop to minimise makespan: State-of-the-art and computational evaluation
(Elsevier, 2017)
The permutation flowshop problem is a classic machine scheduling problem where n jobs must be processed on a set of m machines disposed in series and where each job must visit all machines in the same order. Many production ...
Artículo
New efficient constructive heuristics for the two-stage multi-machine assembly scheduling problem
(Elsevier, 2020-02)
In this paper, we address the two-stage multi-machine assembly scheduling problem, a layout consisting of several dedicated parallel machines in the first stage and identical parallel machines in the second stage. The ...
Artículo
Using real-time information to reschedule jobs in a flowshop with variable processing times
(Elsevier, 2019-03)
In a time where detailed, instantaneous and accurate information on shop-floor status is becoming available in many manufacturing companies due to Information Technologies initiatives such as Smart Factory or Industry 4.0, ...