Artículo
NEH-based heuristics for the permutation flowshop scheduling problem to minimize total tardiness
(Elsevier, 2015)
Since Johnson׳s seminal paper in 1954, scheduling jobs in a permutation flowshop has been receiving the attention of hundreds of practitioners and researchers, being one of the most studied topics in the Operations Research ...
Artículo
A new vision of approximate methods for the permutation flowshop to minimise makespan: State-of-the-art and computational evaluation
(Elsevier, 2017)
The permutation flowshop problem is a classic machine scheduling problem where n jobs must be processed on a set of m machines disposed in series and where each job must visit all machines in the same order. Many production ...
Ponencia
Permutation flowshop problems with initial availability constraints: Characterisation and Analysis
(ADINGOR ( Asociación para el Desarrollo de la Ingeniería de Organización), 2010)
This paper characterises the initial availability constraint problems in a permutation flowshop layout considering different objectives: makespan, total flowtime and idle time. The goal is to analyse the structure ...
Artículo
A new set of high-performing heuristics to minimize flowtime in permutation flowshops
(Elsevier, 2015)
This paper addresses the problem of scheduling jobs in a permutation flowshop with the objective of total completion time minimisation. Since this problem is known to be NP-hard, most research has focussed on obtaining ...
Artículo
On insertion tie-breaking rules in heuristics for the permutation flowshop scheduling problem
(Elsevier, 2014-05)
The most efficient approximate procedures so far for the flowshop scheduling problem with makespan objective – i.e. the NEH heuristic and the iterated greedy algorithm – are based on constructing a sequence by iteratively ...
Artículo
Setting a common due date in a constrained flowshop: A variable neighbourhood search approach
(2010)
In this paper we study a due date setting problem in a flowshop layout. The problem consists of scheduling a set of jobs arriving to the system together with jobs already present (denoted as old jobs), in order to set a ...
Artículo
A beam-search-based constructive heuristic for the PFSP to minimise total flowtime
(Elsevier, 2017)
In this paper we present a beam-search-based constructive heuristic to solve the permutation flowshop scheduling problem with total flowtime minimisation as objective. This well-known problem is NP-hard, and several ...
Artículo
A review and classification of computer-based manufacturing scheduling tools
(Elsevier, 2016)
Computer-based manufacturing scheduling tools can play a key role in the management of industrial operations, as obtaining economic and reliable schedules is at the core of excellence in customer service and of efficiency ...
Artículo
Guidelines for the deployment and implementation of manufacturing scheduling systems
(Taylor & Francis, 2011)
It has frequently been stated that there exists a gap between production scheduling theory and practice. In order to put theoretical findings into practice, advances in scheduling models and solution procedures should be ...
Artículo
A computational evaluation of constructive and improvement heuristics for the blocking flow shop to minimize total flowtime
(Elsevier, 2016)
This paper focuses on the blocking flow shop scheduling problem with the objective of total flowtime minimisation. This problem assumes that there are no buffers between machines and, due to its application to many ...