Buscar
Mostrando ítems 1-6 de 6
Artículo
Single machine scheduling with periodic machine availability
(Elsevier Ltd, 2018-09)
In this paper we address the problem of scheduling jobs on a single machine with cyclical machine availability periods. In this problem, the scheduling horizon is composed of periods where the machine is available followed ...
Artículo
Single machine scheduling with periodic machine availability
(Elsevier, 2018-09)
In this paper we address the problem of scheduling jobs on a single machine with cyclical machine availability periods. In this problem, the scheduling horizon is composed of periods where the machine is available followed ...
Artículo
Permutation flowshop scheduling with periodic maintenance and makespan objective
(Elsevier, 2020-05)
In this paper, we address the permutation flowshop scheduling problem with cyclical unavailability periods where no operation can be processed. Under this constraint, all machines must stop at the same time due to the shift ...
Artículo
New approximate algorithms for the customer order scheduling problem with total completion time objective
(Elsevier, 2017-02)
In this paper, we study a customer order scheduling problem where a number of orders, composed of several product types, have to be scheduled on a set of parallel machines, each one capable to process a single product type. ...
Artículo
The distributed permutation flow shop to minimise the total flowtime
(Elsevier Ltd, 2018-04)
In the last years, researchers are paying special attention to scheduling in distributed environments due to the increasing benefits of multi-factory manufacture. In this paper, we address the distributed permutation ...
Artículo
The 2-stage assembly flowshop scheduling problem with total completion time: Efficient constructive heuristic and metaheuristic
(Elsevier, 2017-12)
In this paper, we address the 2-stage assembly scheduling problem where there are m machines in the first stage to manufacture the components of a product and one assembly station (machine) in the second stage. The objective ...