Buscar
Mostrando ítems 1-4 de 4
Artículo
Constructive and composite heuristics for the 2-stage assembly scheduling problem with periodic maintenance and makespan objective
(Elsevier, 2022-11-15)
This paper addresses the 2-stage assembly scheduling problem to minimise makespan with availability constraints, where the machines are not always available due to periodic maintenance activities. To the best of our ...
Artículo
New efficient constructive heuristics for the two-stage multi-machine assembly scheduling problem
(Elsevier, 2020-02)
In this paper, we address the two-stage multi-machine assembly scheduling problem, a layout consisting of several dedicated parallel machines in the first stage and identical parallel machines in the second stage. The ...
Artículo
Deterministic Assembly Scheduling Problems: A Review and Classification of Concurrent-Type Scheduling Models and Solution Procedures
(Elsevier, 2019-03)
Many activities in industry and services require the scheduling of tasks that can be concurrently executed, the most clear example being perhaps the assembly of products carried out in manufacturing. Although numerous ...
Artículo
New hard benchmark for the 2-stage multi-machine assembly scheduling problem: Design and computational evaluation
(Elsevier, 2021-08)
The assembly scheduling problem is a common layout with many applications in real manufacturing scenarios. Despite the high number of studies dealing with this problem, no benchmark has been proposed up-to-now in the ...