Buscar
Mostrando ítems 1-10 de 52
Artículo
Schedule and Cost Control in Dwelling Construction Using Control Charts
(Bentham Open, 2014)
Methods to monitor the schedule and to control cost in dwelling construction projects are numerous and varied but commonly constitute an obstacle to a fast and agile response by construction managers, whose decisions require ...
Artículo
A CSP model for simple non-reversible and parallel repair plans
(Springer, 2010)
Thiswork presents a constraint satisfaction problem (CSP) model for the planning and scheduling of disassembly and assembly tasks when repairing or substituting faulty parts. The problem involves not only the ordering ...
Artículo
Constructive and composite heuristics for the 2-stage assembly scheduling problem with periodic maintenance and makespan objective
(Elsevier, 2022-11-15)
This paper addresses the 2-stage assembly scheduling problem to minimise makespan with availability constraints, where the machines are not always available due to periodic maintenance activities. To the best of our ...
Artículo
Exploring the benefits of scheduling with advanced and real-time information integration in Industry 4.0: A computational study
(Elsevier, 2022-05)
The technological advances recently brought to the manufacturing arena (collectively known as Industry 4.0) offer huge possibilities to improve decision-making processes in the shop floor by enabling the integration of ...
Artículo
NEH-based heuristics for the permutation flowshop scheduling problem to minimize total tardiness
(Elsevier, 2015)
Since Johnson׳s seminal paper in 1954, scheduling jobs in a permutation flowshop has been receiving the attention of hundreds of practitioners and researchers, being one of the most studied topics in the Operations Research ...
Artículo
A new vision of approximate methods for the permutation flowshop to minimise makespan: State-of-the-art and computational evaluation
(Elsevier, 2017)
The permutation flowshop problem is a classic machine scheduling problem where n jobs must be processed on a set of m machines disposed in series and where each job must visit all machines in the same order. Many production ...
Artículo
New efficient constructive heuristics for the two-stage multi-machine assembly scheduling problem
(Elsevier, 2020-02)
In this paper, we address the two-stage multi-machine assembly scheduling problem, a layout consisting of several dedicated parallel machines in the first stage and identical parallel machines in the second stage. The ...
Artículo
Energy management of refrigeration systems with thermal energy storage based on non-linear model predictive control
(MDPI, 2022-09-02)
This work addresses the energy management of a combined system consisting of a refrigeration cycle and a thermal energy storage tank based on phase change materials. The storage tank is used as a cold-energy buffer, thus ...
Ponencia
Permutation flowshop problems with initial availability constraints: Characterisation and Analysis
(ADINGOR ( Asociación para el Desarrollo de la Ingeniería de Organización), 2010)
This paper characterises the initial availability constraint problems in a permutation flowshop layout considering different objectives: makespan, total flowtime and idle time. The goal is to analyse the structure ...
Artículo
A speed-up procedure for the hybrid flow shop scheduling problem
(Elsevier Ltd, 2021)
During the last decades, hundreds of approximate algorithms have been proposed in the literature addressing flow-shop-based scheduling problems. In the race for finding the best proposals to solve these problems, speedup ...