Gallego Len, Antonio JavierMerello, Gonzalo M.Berenguel Soria, ManuelCamacho, Eduardo F.2021-05-132021-05-132019Gallego Len, A.J., Merello, G.M., Berenguel Soria, M. y Fernández Camacho, E. (2019). Gain-Scheduling Model Predictive Control of a Fresnel Collector Field. Control Engineering Practice, 82, 1-13.0967-0661https://hdl.handle.net/11441/109014Model predictive control strategies have been applied successfully when controlling solar plants. If the control algorithm uses a linear model associated only to an operating point, when the plant is working far from the design conditions, the performance of the controller may deteriorate. In this paper, a gain scheduling model predictive control strategy is designed for the Fresnel collector field located at the Escuela Superior de Ingenieros de Sevilla. Simulation results are provided comparing the proposed strategy with another linear MPC controller showing a better performance. Furthermore, two real tests are presented showing the effectiveness of the proposed strategy.application/pdf13 p.engAttribution-NonCommercial-NoDerivatives 4.0 Internacionalhttp://creativecommons.org/licenses/by-nc-nd/4.0/Solar energyFresnel collectorGain schedulingGain-Scheduling Model Predictive Control of a Fresnel Collector Fieldinfo:eu-repo/semantics/articleinfo:eu-repo/semantics/openAccesshttps://doi.org/10.1016/j.conengprac.2018.09.022